Figures that carry a decision
BI is bought as reporting and expected to be steering. In between lies the difference between a screen and an action.
Four figures that carry a decision
Four numbers, two charts — and for every number, what it is for and how it is calculated.
Example data. The limit is set, not measured — and drawn in for that reason: a traffic light whose limit nobody knows is a colour without information.
Example data. Only the last point is labelled — a number on every one turns the trend into a table with a line.
| Metric | What it is for | How it is calculated |
|---|---|---|
| Empty running | Where capacity is paid for and not sold. Planning can act on it — per lane, never on the company figure. | Empty kilometres ÷ total kilometres, per lane and month. Kilometres from telematics, not from route calculation. |
| Orders per trip | The lever underneath: two shipments on one trip double the revenue, not the effort. | Completed orders ÷ trips driven. Cancellations do not count — otherwise the figure rises when things go worse. |
| Days to the credit note | The consignment note moves the money. Whatever sits here sits on both sides: the sub-carrier waits, the customer pays against the document. | Calendar days from upload to release, median rather than mean. One dispute running six weeks moves the mean. |
| On-time rate | What the customer notices. No daily decision — the question of whether a price holds. | Shipments inside the agreed window ÷ all. The window is in the contract, not the report. |
A report says that. What follows from it is on KPIs and AI — drag it through twelve months.
Four numbers, four recipients, four decisions. A fifth needs a fifth recipient — otherwise it belongs to nobody.
It starts with the collection: forty figures, every one of them correct.
The question before the dashboard
Which decision gets made differently? If that is hard to answer, what is missing is not the report — it is the recipient.
When the answer is hard
A dashboard for “management” re-plans no trip.
When it is easy
The metric reaches someone who can act the same day. That is the whole difference.
A metric with no decision behind it is decoration — and it costs as soon as somebody maintains it.
Measured ≠ calculated
Recorded and estimated look identical in the report. Two fields instead of one save the first dispute.
Data quality is not a pre-project
Master data decays continuously. What helps is a point where an error surfaces — not a spring clean.
No model repairs it
A broken master record does not become correct through AI. Only more articulate.
A metric only tells you that something is the case: 18 per cent empty running. Why it is rising, and who has to act now, is nowhere to be seen. On KPIs and AI it stands right beside it — the explanation next to the figure, the next step below it. And how an AI learns this before it is allowed a say is explained under shadow mode.
A metric comes from closed cases — only there is the outcome actually known.
Worked example: the empty-run rate
A metric everyone has and almost nobody calculates the same way — three companies, three numbers.
What is missing
Name, definition, owner — and the provenance: telematics or route calculation?
What actually counts
Not the level, the movement. 18 or 23 per cent says little; rising for three months says a lot.
A metric everyone calculates differently is not a metric. It is an agenda item.
Tools, briefly placed: Power BI where someone wants to look for themselves. For forms and invoices, classic reporting tools. A data warehouse from the third source that names the same figure differently.
Three companies measure the same thing: the share of empty kilometres.
Where the best solution sits today
What is named is the pattern, not the vendor — a product name ages, an idea does not.
One term, one definition
Every metric with a name, a definition and an owner. It prevents the meeting where two departments present the same figure differently.
Retire reports
Without pruning you accumulate screens nobody opens and everyone maintains. Pruning is part of operations.
Provenance at the value
Measured or calculated, from which system — that belongs with the number, not in a footnote. Only then does it hold up in a dispute.